Quick answer
- The deposit is not the full cash requirement.
- Stamp Duty is calculated separately from the mortgage.
- Legal fees and outlays should be quoted in writing.
- Keep a buffer for property-specific work and costs after keys are received.
On this page
The complete buyer-cost checklist
| Cost | When it arises | How to budget |
|---|---|---|
| Deposit | Contract and completion funding | Based on mortgage and LTV; booking deposit usually forms part of it |
| Stamp Duty | Before completion | Calculate from current Revenue rates |
| Solicitor | Legal work and closing | Get fee, VAT and outlays itemised |
| Valuation | Mortgage requirement | Lender-approved valuer; not a structural survey |
| Survey or engineer | Before committing where appropriate | Scope depends on property type and condition |
| Insurance | Usually before drawdown | Home insurance plus mortgage protection where required |
| Registration/searches | Handled through solicitor | Confirm Tailte Éireann and other outlays |
| Moving and setup | At and after closing | Removal, utility, furniture, repairs and security |
Residential Stamp Duty in 2026
Revenue’s standard residential rates are 1% on consideration up to €1 million, 2% on the portion over €1 million up to €1.5 million, and 6% on the portion over €1.5 million. Special rules can apply, including certain multiple-property transactions and the VAT-exclusive calculation for a new build.
Use the Stamp Duty Calculator and have the solicitor confirm the transaction-specific amount before closing.
Example cash budget for a €400,000 home
A buyer using a €360,000 mortgage needs a €40,000 deposit and, at the standard 1% rate, €4,000 Stamp Duty. That €44,000 is only the starting cash requirement. Legal professional fees, VAT, searches and registration outlays, valuation, survey, insurance, moving and initial work must still be added.
Because professional fees and property needs vary, request actual quotes instead of publishing one false universal total. Keep the deposit, confirmed transaction costs and emergency buffer as separate lines.
Costs commonly confused with each other
- A booking deposit is normally part of the overall deposit, not an extra deposit.
- A lender valuation confirms security value; it is not a detailed structural survey.
- A solicitor quote may separate professional fee, VAT and third-party outlays.
- Mortgage protection covers the loan on death subject to policy terms; home insurance covers insured property risks.
- Apartment buyers should inspect management-company information and budget the service charge.
Budget before bidding
- Estimate the maximum mortgage but choose a payment that is sustainable.
- Protect enough cash for the deposit and current Stamp Duty.
- Request legal, valuation, survey and insurance quotes.
- Check renovation, furnishing, energy and management-charge needs for the actual property.
- Leave an accessible emergency buffer after completion.
- Do not count Help to Buy or FHS funding until eligibility and property conditions are confirmed.
Frequently asked questions
What costs are involved in buying a house in Ireland?
Common costs include deposit, Stamp Duty, solicitor fees and outlays, valuation, survey, insurance, registration, moving and initial property work.
How much Stamp Duty is due on a €400,000 home?
At the standard 1% residential rate, the illustration is €4,000. New-build and special transaction rules should be confirmed by the solicitor.
Is the booking deposit an extra cost?
It is normally credited towards the total purchase deposit, but confirm the contract and refund position before signing.
Is a mortgage valuation the same as a survey?
No. The valuation protects the lenders security; a survey or engineer report investigates property condition within its agreed scope.
Are solicitor outlays included in the legal fee?
Not always. Ask for an itemised written quote showing professional fee, VAT and third-party outlays separately.
Should I use all savings as the deposit?
A larger deposit may help, but using every euro can leave no money for closing costs or emergencies. Build a full cash budget first.
Sources & references
Related calculators
Use these tools for the numbers behind this guide.